OUTDATED IT INFRASTRUCTURE AND EXPANSION PLANS
Doosan Lentjes Czech supplies power plants and incinerators with sophisticated fluidized bed combustion and flue gas cleaning technologies. It is designed by about 40 engineers working on expensive workstations that nevertheless were unable to cope with the ever-increasing demands CAD applications (AutoCad, Inventor, etc.). The cycle of purchases of more powerful hardware was never ending and he was making unbearable a large part of the operating costs.
At the same time, Doosan Lentjes Czech needed to build facilities for a new design team in Poland, which would operate without local IT support. Following the trends in the field of technical modelling led the company's management to the decision to follow the path of virtualization of CAD environments and end workstations - in cooperation with experts from ORBIT.
Challenges for ORBIT
- Build a powerful, secure and stable CAD virtual environment
- To unify the user environments of the Czech and Polish representation
- Ensure that (remote) user workstations are added quickly and efficiently
- Significantly simplify IT system administration
- Reduce operating costs
TWO BRANCHES, ONE IT CENTRE
Implemented solution 3D Workplace we have built on Citrix and NVIDIA technologies. The new Polish office went into the cloud environment first, then we transformed our home IT infrastructure.
The unification of user environments has brought administrators easy administration. Adding new users, which used to involve a number of time-consuming and costly steps, is now a matter of a few clicks with minimal costs.
Doosan Lentjes Czech engineers have started to use the 3D Workplace virtualised workplace to its full potential within 4 months. Sharp operation of the entire technology company today completely in the cloud. No blackouts. Without compromising sensitive corporate data. And without having to work only from a Prague or Polish office.
Results for DOOSAN LENTJES
- Virtualized IT infrastructure of Prague headquarters and Polish branch
- Increasing the performance, efficiency and mobility of engineers
- 70% time saving in end station administration
- Assumption of further development of the 3D Workplace concept